According to its use function, beixinyuwang hot melt modified asphalt waterproof rolling material can be divided into ordinary type, root and piercing resistant type, salt and alkali resistant type, road and bridge special type, decorative type, etc., applicable to a wide range of fields

MODIFIED ASPHALT WATERPROOF ROLL (HOT MELT SERIES)

YWR-483
SBS Modified Bitumen Waterproof Membrane for Railway and Bridge

Modified Asphalt Waterproof Roll (Hot Melt Series)

★ Product Description download

The products are divided into hot-melt (R) or hot-melt (J) construction waterproofing membranes according to the construction method. The upper surface material of the coil is fine sand (S). The hot-melt construction waterproofing membrane is divided into polyethylene film (PE) and fine sand (S) according to the surface material. The material of the lower surface of the hot-melt adhesive construction waterproofing membrane is: fine sand (S).

Product Specification:

10.0

Length/m:

1.0

Width/m:

3.5      4.5

Thickness/mm:

————

The product is made of long-fiber polyester felt as the base, SBS thermoplastic elastomer modified asphalt as the coating material, and the two sides are covered with a waterproof material made of insulating material. The material has high strength, large elongation and excellent heat resistance, flexibility and shear resistance. It can withstand long-term load movement of bridge deck, prevent structural damage caused by water seepage, steel corrosion, concrete carbonization, and greatly extend the use of bridge deck life.

PRODUCT

INTRODUCTION

FEATURES

PRODUCT

The product has excellent high temperature resistance and can withstand the paving construction of asphalt concrete at high temperature.

High bonding strength and good adhesion to the base layer.

High strength and shear resistance can withstand the dynamic load of bridges.

It is excellent in impermeability and water impermeability and can resist the action of hydrodynamic pressure.

It is resistant to smashing, tearing, fatigue and aging resistance, and can resist the influence of high and low temperature dynamic loads on the bridge deck.

When the coil is constructed by hot melt method, the lap joint should overflow the hot melt modified asphalt.
Sealing is done at the lap and the end.

● Construction is not allowed on rainy and snowy days and on windy days above Grade 5.
● The construction environment temperature of the coil should not be lower than -10 °C.

Notes:

he base layer must be flat, solid, dry, free of dust, oil and sharp corners.
Additional processing of detail nodes.
Brush the base treatment agent.
The coil is unfolded at the position of the elastic wire. The bottom layer and the base layer of the coil are baked with a flame spray gun, and the coil is laid, compacted while being laid, and the air is removed to make the coil and the base layer firmly adhere.

The hot-melt coil material is constructed by hot melt method;
the hot melt adhesive type coil material is constructed by hot melt adhesive method.

METHOD

CONSTRUCTION

≤1

Oil permeability / number of sheets

10,000 cycles without damage

Seam deformation ability

0.1,30min impervious

Impermeability after hot rolling/MPa

≥0.050

50℃ bond strength/MPa

≥0.12

50 °C shear strength/MPa

Application Performance

Tension retention rate/%≥90
Elongation retention rate/%≥90
Low temperature flexibility:
-20℃,No crack
Dimensional change rate/%≤0.5
Quality loss/%≤1.0

Heat aging

Tension retention rate/%≥90
Low temperature flexibility:-25℃,No crack
Mass increase/%≤1.0

Salt treatment

-25,No crack

Low temperature flexibility /℃

≥40

Elongation at maximum tensile force (vertical and horizontal)/%

115   No sliding、No runny、 No dripping

Heat resistance/℃

3.5mm≥1.5
4.5mm≥2.0

Thickness of the lower surface of the coil/mm

3.5mm≥2400
4.5mm≥3100

Soluble content/(g/㎡)

modified asphalt waterproofing membrane for road bridge

JC/T974-2005《modified asphalt waterproofing membrane for road bridge》

STANDARD

EXECUTIVE

≥800

Tension (vertical and horizontal/(N/50mm)

Waterproof engineering

Beijing Guomao Bridge

Waterproof engineering

Tangjin Expressway

It is widely used in various types of road-bridge paving asphalt concrete paving waterproofing projects, and is also suitable for waterproofing projects such as parking lots and airport runways.

FIELD

APPLICATION