BNBM Yuwang waterproof coating series products can be divided into polymer waterproof coating, polymer modified asphalt waterproof coating and polymer cement waterproof coating.
WATERPROOF COATING SERIES
Spray-applied Quick-cured Rubberized Bitumen Waterproof Coating
Waterproof coating ranges
————
Spraying quick-setting rubber asphalt waterproof coating is a kind of polymer-reactive waterproof and protective material. It forms a high-elastic rubber coating waterproof coating immediately after spraying, which is modified emulsified asphalt and synthetic high molecular polymer (component A). The special curing agent (component B) consists of two components. It is sprayed with special machinery at room temperature to form a dense, continuous and seamless waterproof layer. The product has the characteristics of water-based environmental protection, non-toxicity, instant molding, high adhesion, high recovery rate and simple construction. Spraying quick-setting coatings changed the traditional construction method with convenient and efficient spraying construction, and completely solved the leakage problem caused by the joint.
PRODUCT
INTRODUCTION
FEATURES
PRODUCT
1.Before spraying, it must be fully stirred, and the mixing time is controlled within 5 to 10 minutes.
2.The temperature of the construction environment should be higher than 5 °C. In the humid environment without ventilation, the air exhaust equipment should be pre-set; the wind in the open air construction should be no more than 5, and it should not be sprayed on the base layer with clear water and frost (dew).
3.When spraying on a base surface with high humidity, the local surface temperature is higher than 40 °C, and it is better to avoid the construction at high temperature.
4.After the construction process and after completion, it should be inspected at any time, and the problem should be repaired or refilled in time.
5.Reference dosage: 1.0mm thick coating film, the total amount of coating is about 1.8 ~ 2.0kg / m2.
Precautions
In the roots, floor drains, yin and yang angles, etc., the non-woven fabric should be used for additional reinforcement treatment. The non-woven fabric should be cut in advance according to the width of the joint, and placed in the quick-setting rubber "A" in advance, so that the "A" material can fully infiltrate the non-woven fabric and then be reinforced. The reinforcing material should be placed in the middle of the coating, and the material should be firmly adhered, not hollowed or not. The thickness of the additional waterproof coating should not be less than 1.0 mm.
Spraying process
1.In order to increase the adhesion to the substrate, a layer of quick-setting rubber A component is sprayed first during construction, and then two-component spraying is performed.
2.The product is made up of double-tube spraying equipment. It is sprayed at a high temperature in a high-pressure fan shape. The A component and the B component are mixed and reacted outside the spray gun in proportion, and sprayed on the surface of the object at one time, and the film can be formed in 3 to 5 seconds. The spray gun should be 600~800mm from the base surface, and the spray angle should be 90°.
3.After the additional layer is formed into a film, a large area is sprayed, and the spray gun is sprayed at the time of spraying to ensure the thickness of the film, and the number of cross-spraying is determined according to the thickness of the project.
Construction machine
1.Spraying equipment: special spraying machine, spray gun and ancillary equipment
2.Cleaning tools: brooms, wind dust collectors, brushes, etc.
3.Protective equipment: helmets, protective clothing, gloves, etc.
4.Auxiliary equipment: agitator, filter, hydrometer, etc.
●Process flow
Base treatment → detail processing → large area spraying construction → finished product maintenance → inspection and repair → quality acceptance
The base layer must be clean, flat, firm, and free of debris. If there are holes and cracks in the base surface, seal the liquid product with liquid rubber before spraying to repair the base surface.
Spraying method
METHOD
CONSTRUCTION
≤500
Ammonia/mg/Kg
≤300
Sum of benzene, toluene, ethylbenzene, and xylene/mg/Kg
≤100
Free formaldehyde /mg/Kg
≤80
Volatile organic compounds (VOC)/g/L
The hazardous substance limit of the product meets the Class A requirements in JC1066-2008 《Limits of Hazardous Substances in Building Waterproof Coatings》.
Salt treatment:≥600/≥800
Heat treatment:≥600/≥800
UV treatment:≥600/≥800
Elongation at break/%
Standard condition:≥800/≥1000
Alkali treatment:≥600/≥800
Acid treatment:≥600/≥800
Elongation at break/%
Standard condition≥0.6/0.8
Tensile strength/MPa
Salt treatment (no cracking, reaking)-10/-15;Heat treatment (no cracking, reaking)-10/-15;UV treatment (no cracking, breaking)-10/-15
Low temperature flexibility/℃
Standard conditions (no cracking, breaking)-15/-20;Alkali treatment (no crackinng, breaking)-10/-15;Acid treatment (no cracking, breaking)-10/-15
Low temperature flexibility/℃
≤2.0
Bibulous rate(24h)/%
No water seepage
Nail rod water tightness
I≥80 Ⅱ≥85
Elastic recovery rate/%
≤24h
Dry time/h
≤5
Gel time/s
0.3MPa, 30min no water seepage
Water impermeability
≥(100土2)℃,No runny, no dripping, slidin
A component heat resistance
I≥50 Ⅱ≥55
A component solid content/%
Physical Index
Q/PYW0038《Spray-applied Quick-cured Rubberized Bitumen Waterproof Coating》
STANDARD
EXECUTIVE
Dry base≥0.40
Wet base≥0.40
Bond strength/MPa
It can be widely used in waterproofing, anti-seepage and anti-corrosion of construction engineering, electric power engineering, environmental protection facilities, harbor docks, subway tunnels, chemical facilities, water conservancy facilities, landfills and other fields.
FIELD
APPLICATION
From Monday to Saturday at 8:00am -18:00pm
Email :wugang@bnbm.com.cn
Address: South of Xingyou Street, West of Jinger Road, Xinglongtai District, Panjin City, Liaoning Province, China
400-600-0427
Contact us
Hydro power
Municipal building
Commercial building
Civil building
Bridge, tunnels and roads
Overseas engineering
Rail roads and subways
Major projects
Classical engineering cases
Waterproof coating ranges
Excellent and Secure Waterproofing System Ranges
Polymer ranges of waterproof materials
Self adhering ranges of modified asphalt waterproof membrane
Hot-torched ranges of modified asphalt waterproof membrane
Products center
Development history
Honor
Enterprise culture
Production bases
Company introduction
Enter BNBM Yuwang